Ready to open!

I’ll be honest – I’ve been terrible at keeping this blog updated. Oh well. Since the last post here, we have –
Painted all the playhouses.
Stained the ship.
Added a ton of toys and accessories.
Installed 2ksqft of carpet.
Installed 1800sqft of fall flooring.
Completed all painting, counters, cabinets, etc.
Added all of the big blue blocks.
Installed and configured our wifi and camera systems.
…and a ton of other things I’m not remembering right now…
Our soft opening was last weekend, and we learned a ton. We’ll be busy addressing the lessons learned this week, in preparation for our GRAND OPENING on Saturday, Nov 9! So check out these pictures, and come by to see us soon!